Building Envelope

Thursday, 17th September 2026

  • Choose whichever seminar/s are of interest
  • Register by completing the form below
  • The day before the event you will receive joining links (most used formats are Teams and Zoom)
  • On the day of the event, click the supplied link
  • Watch the seminar and ask any questions you
    may have at the end
  • A full CPD Certificate will be provided after the event

Line-Up For the Day

09:30

An Updated Guide to Posi-Joists, Future Homes and MVHR

MiTek Industries Ltd

This NEW updated webinar is designed to give the delegates a better understanding of MiTek and Posi-Joists and builds on their existing knowledge of Posi-Joists. It will help delegates to understand: Who MiTek are; What a Posi-Joist is; Why you should use Posi-Joists; What the cost of a floor is; Testing of Posi-Joists; Future Homes; Health & Safety; Posi-Joist details; Where to go from here.

10:30

Addressing Thermal Bridging in Steel Lintel Specification

Keystone Lintels Ltd

This CPD offers an indepth insight into thermal bridging in lintels and Part L regulations. It examines heat loss in buildings and areas in the fabric of the building where a thermal bridge can occur. Book your place today.

11:30

The Renovation Revolution – Light from Above

Velux Company Ltd

Creating natural Daylight and Ventilation in buildings is essential for a healthy indoor environment. However, due to the continuous increase in global temperature, we need to mitigate excess heat. This CPD will demonstrate the best use of Natural Daylight in a ground floor extension as well as managing Part ‘O’ overheating.

13:00

Presentation to Be Advised

Visqueen

Presentation to be advised.

14:00

Presentation to Be Advised

Keyfix Ltd Ni

Presentation to be advised.

15:00

Fire Safety in Tall Buildings

Rockwool Ltd

Fire safety is of the utmost importance when specifying materials for the external walls of all buildings, but tall buildings pose unique risks and challenges. This CPD highlights relevance to Building Regulations and government guidance for high rise buildings, and what this means when it comes to insulation and fire stopping.

Register

Please complete the form below and tick which presentations you wish to attend.

A confirmation will be sent upon receipt.

Please note that Internet Explorer is now obsolete so may throw up problems when registering, please use any other browser.

This field is for validation purposes and should be left unchanged.
Specify which presentations you wish to view...(Required)
Address

Chat With dcecpd

We’d Love To Hear From You

Call us on 01630 673000
Email us at info@dcecpd.co.uk
Find us at The Oaks, Wesleyan Road, Ashley Shropshire, TF9 4JT

© Copyright DCECPD. All rights reserved | Website by CLYQ